Winners don't compromise
Winners don't compromise
Save time, money and gas with
Walter Schnorrer® products
100 PPM
50 PPM
7 PPM
100 PPM
50 PPM
7 PPM
Why purge?
There are many situations in the welding of stainless steels or other special metals where introducing Walter Schnorrer ApS gas purge equipment to the welding procedure can improve weld quality and provide very valuable cost reductions and savings in job time and argon gas consumption.
There are often several methods by which to try and achieve a purged welding environment, and one essential feature of any method is that it always produces the critical low level of oxygen specified for the material. The purge tool used must be robust and must purge efficiently every time, regardless of variables, e.g. the welding position or the presence of pipe elbows and bends.
The Walter Schnorrer ApS gas purge systems are designed so that a gas flow rate in litres/minute of 10% of the pipe diameter (mm), produces a purge time of only 1½-2½ minutes. It is expected that when welding 20” pipe, the cost of the purge tool will be recovered over 15-20 welds. When using foam plugs the purge time is different for each pipe dimension.
News and events
Schweißen & Schneiden 2023
Thanks you for your visit at our booth!